Construction and Mining Progress Monitoring

Repeat aerial records of progress, stockpiles and earthwork.

What it is

Construction and mine sites change every week. A monitoring programme flies the same site on an agreed interval and delivers a current orthomosaic, and where required an elevation model, so progress and volumes can be compared with the last visit. IPAGE UMS uses this for building projects, earthworks and mining stockpiles. Volumes are calculated only when a reference surface or a previous flight exists. The service does not publish a standing claim about tonnes saved or billing disputes resolved. Frequency, area and the comparison you need are set in the programme.

Use cases

Construction progress

A dated aerial record of what was built between visits.

Earthwork tracking

Surfaces that show cut and fill when a base surface is available.

Mining volumetrics

Stockpile and pit surfaces for quantity checks.

Stakeholder updates

A map non-surveyors can read in a review meeting.

As-built snapshots

A record at handover or at a contract milestone.

Deliverables

Accuracy is confirmed in each project scope. It is not published as a single figure.

DeliverableFormat
Progress orthomosaicGeoTIFF
Elevation surfaceGeoTIFF
Volume tablePDF / spreadsheet
Comparison notesPDF

Equipment and technology

Repeat missions use the same class of RGB mapping aircraft so visits can be compared. LiDAR is added only if the scope needs it, for example under vegetation or for a denser surface.

How a project runs

  1. 1

    Consult

    Agree the boundary, the visit interval and whether volumes are required.

  2. 2

    Plan and permit

    A repeatable flight plan and site access rules are fixed for the programme.

  3. 3

    Fly and capture

    Each visit follows that plan and is labelled with the flight date.

  4. 4

    Process and deliver

    Maps and, where scoped, volume tables are issued after each visit.

Project image used by IPAGE UMS for the Amaravati capital mapping record

Related project

Amaravati Capital City Mapping

The work supplied the mapping and GIS baseline used for master-plan development. No additional time-saved or accuracy percentage is stated here.

View case study

FAQ

Frequently asked questions

01How often should a site be flown?

That depends on how fast the site changes. The interval is agreed in the programme rather than fixed on this page.

02Can you measure a stockpile from one flight?

A single flight gives the current surface. A volume needs a base surface or a previous survey to compare against.

03Is this the same as a one-off topographic survey?

A one-off survey is a single map. Monitoring is the same kind of map repeated so you can see change.

04Do you replace a site quantity surveyor?

The aerial data supports the quantity team. It does not replace their sign-off unless the contract says so.

Related services: Drone Survey and MappingDrone Inspection